Board

Notice

[Notice] [Namje Hall] Emergency Repair Work Due to Stormwater Drainage Pipe Blockage

  • 2026-05-22
  • 39

Emergency Repair Work Due to Stormwater Drainage Pipe Blockage




Due to a blockage in the stormwater drainage pipe around Namje Hall, emergency repair work will be carried out as follows.


  1. Construction Area: Southern side of Namje Hall
  2. Schedule: May 23, 2026 (Sat) from 09:00 AM until restoration is completed
  3. Reason for Construction: Inability to drain stormwater in the west courtyard due to blockage in the stormwater drainage pipe
  4. Construction Details: Replacement work for the underground stormwater drainage pipe
  5. Note: Some noise may occur due to the use of an excavator.